The Ministry of Heavy Industries (MHI) has received 22 bids for the 10 GWh Advanced Chemistry Cell (ACC) manufacturing capacity offered under the Production Linked Incentive (PLI) Scheme, marking a step towards strengthening India’s domestic battery manufacturing ecosystem, according to a press release issued by the Press Information Bureau (PIB).
The capacity is earmarked for Grid-Scale Stationary Storage (GSSS) applications and forms part of the overall target of establishing 50 GWh of ACC manufacturing capacity under the National Programme on Advanced Chemistry Cell (ACC) Battery Storage.
The Request for Proposal (RFP) was issued on the Central Public Procurement (CPP) Portal on 15 July 2026, followed by a pre-bid conference on 29 July 2026. The deadline for bid submission was 10 November 2026, and the technical bids were opened on 11 November 2026 at the Ministry of Heavy Industries in the presence of the participating bidders.
The bidding process is being conducted online through a transparent two-stage Quality and Cost Based Selection (QCBS) mechanism.
The 22 bidders include ACME Solar Holdings, Amara Raja Advanced Cell Technologies, Avaada Electro, Exide Energy Solutions, Fujiyama Power Systems, GK Energy, Godawari New Energy, JPM Energy Solutions, JSW Neo Energy, Lineage Power, Mahendra Sponge and Power, and Megha Engineering and Infrastructures.
Other participants include Nsure Reliable Power Solutions, Reliance Industries, Renew Photovoltaics, Sai Bioenergy, Shirdi Sai Electricals, Sun Drops Energia, Utex New Energy, Vikram Solar, Waaree Energy Storage Solutions and Zetsol Energy.
The strong industry response reflects growing interest in establishing large-scale domestic ACC manufacturing facilities. The initiative is expected to support India’s battery manufacturing capabilities and strengthen the supply chain for grid-scale energy storage solutions.
In May 2021, the Union Cabinet approved the PLI Scheme on the ‘National Programme on Advanced Chemistry Cell (ACC) Battery Storage’, with a total budgetary outlay of ₹18,100 crore for achieving an ACC manufacturing capacity of 50 GWh in the country. The Scheme seeks to enhance India’s domestic ACC manufacturing capabilities and encourage large domestic and international players to establish a globally competitive ACC manufacturing ecosystem in India.
The allocation of 10 GWh for GSSS applications is expected to support the country’s rapidly growing energy-storage requirements arising from the expansion of renewable energy. It will contribute to enhancing energy security and deepening the domestic value chain for ACC technologies.
The strong participation in the tender reflects growing industry interest in India’s ACC manufacturing potential and reinforces the Government’s commitment to building a technologically self-reliant, globally competitive and sustainable ACC ecosystem, in line with the vision of Viksit Bharat @2047.
Source: Press Information Bureau




